I am writing to let you know what a fine job you team is doing while servicing our many a.c. systems here at Coca Cola Enterprises (Brandon Shared Services). I have got to know most of the technicians that do our maintenance and repairs and am very impressed with the work that has been done the last 18 months I have been associated with the facilities here in Brandon and MSI. I have always received a positive reception over the phone and all response times have been phenomenal. The A.C. unite have well taken care of when your techs are onsite and I have had no problems with them.
I consider MSI my most respected contractor/vendor used at our facilities.
Thank you for all of the excellent service.”
Sincerely,
Danny Williams
Facilities Assistant
~ Coca Cola Enterprises
|
Case Study - Disney DISC Chiller & Generator Design/Build Project
When Walt Disney World recognized the need to make its DISC data center, which processes all transactions for the entire corporation, secure from severe weather and completely redundant in the event of electrical or mechanical failure, MSI was selected as a the mechanical design/build team member.
The project entailed installing a new central energy plant with Trane chillers, reconfiguring the chilled water feed from the Reedy Creek district energy plant for redundancy, installing, programming, and commissioning a new Trane Tracer Summit automation system with completely redundant diagnostics and web interface and converting dual-source Liebert cooling systems to chilled water.
There were several engineering and logistical challenges. First, the facility had to be completely redundant in every way. Second, the project had to be conducted while keeping the existing facility in operation. Finally, the final product had to withstand 190 mph winds (Class 5 Hurricane). We had no idea that aspect of the facility would be tested by three hurricanes in two months! However, the systems performed flawlessly after the most active hurricane season in several decades. This project is proof positive that teamwork, pre-planning, and execution can result in superior results!
|