Case Studies


"I want to take this opportunity to congratulate you and you staff on the successful completion of the design build project at the Disney Worldwide Data Center. The renovation project was difficult, time sensitive and served an extremely critical facility for Disney Worldwide Services. There was no room for error on this project.

The skilled craftsmen that worked on this project deserve all the credit. MSI self-performed all the trades, from the sheet metal to the pip insulation to the chilled water piping to the building automation systems and test and balance. The work was performed flawlessly.

We are extremely proud of our facility and the work performed by your craftsmen. We look forward to many years of operating an energy efficient and reliable central energy plant.

Please pass on the accolades to your staff."

Sincerely,

Jim Larson, Manager
Facilities and Asset Management, CIS-East

~ Disney WorldWide Services


Case Study - Wyndham Southpark 3rd Floor

Type of Work:
 
 
 
 
 
 
 
 
 
Retrofit/Renovation
 
LEED-CI (Commerical Interiors)
Location:
9310 Southpark Center Loop
Orlando, FL 32819
 
General Contractor:
Alexander Whitt Construction
6150 D Edgewater Drive
Orlando, FL 32810
(407) 298-4298
 
Project Description:
A 40,000-square-foot LEED-Silver third floor renovation.
MSI’s scope of work for the interior build-out includes
the supply and installation of Mitsubishi ductless air
conditioning units with R410 refrigerant, Trane variable
air volume controls and fan-powered boxes.
 
Project Manager:
Ray Holshey
 
Year of Construction:
2008