"We have been experiencing unusual circumstances and operations of the HVAC equipment in our Palm Coast location. The major tenant of the building is The Ginn Company.
The situation was created by another HVAC contractor, who has failed in their initial installations of the equipment and their customer service response. Your staff has stepped into this situation and has performed each time we have requested assistance. It is a pleasure to work with professionals.
Please pass along our company’s gratitude for a job well done to your staff!"
Sincerely,
Clay R. Seay
Business Development Manager
~ The Hardy Group
|
Case Study - Central Florida Blood Bank upgrades its Trane Tracer 100 Automation System
Building Automation Experience
Central Florida Blood Bank has the daunting task of hosting Burnham Institutes pilot laboratory facility until Burnham’s new facility is completed at Lake Nona Medical Research Center in 2009. As part of the significant modifications required supporting Burnham, the Blood Bank had to upgrade its late 80’s vintage Trane Tracer 100 Building Automation System. MSI was called upon to design the Automation Upgrade, utilizing the latest Trane Summit hardware. MSI developed a new series of Graphics for the Blood Bank staff that allows them to better manage the 8 air handling systems and two Trane Chillers in the main Blood Bank Building. In addition, the Tissue Bank Clean Room, a Class 10 Clean Room designed and built by MSI incorporates Trane Summit controls and is now integrated with the main building to provide central operations of these mission critical systems along with a Web-Server that allows access from anywhere in the world. The Burnham Pilot Laboratory constructed by the McCree Construction - MSI Team includes a separate air handling systems, trane summit automation interface and integration with Phoenix Hood and Strobic Air Exhaust controls. For more information about this exciting project contact Shane Smith at MSI.
|