|

“Dear Ray:
I just wanted to take a minute to let you and you company know that it was a pleasure working with MSI at the Kissimmee Christian Academy. Steve Benjamin was great in expediting materials along with answers to the issues that we encountered during this job. Robert Jones, who ran the onsite operations, did an outstanding job as a safe and very professional employee of your company. Robert represented MSI in a very top notch manner from the start all the way to the end. I’m glad we’ll be working with him again on the Burlington Coat Factory job as well as the other members of that team. Thanks for all your help.”
Sincerely,
Darrell Clark
Project Manager
~ Johnson-Laux Construction
|
Case Study - Florida Hospital College of Health Sciences Academic Building Phase 4
Healthcare Experience
| Name and Project Type: |
Florida Hospital College of Health Sciences Academic Building Phase 4
|
| Location of Project: |
671 Winyah Drive
Orlando, Florida 32803
|
| General Contractor: |
Owner Direct |
|
|
| Project Description: |
New construction, 3-story, 63,479 gross square feet, replacing an existing school building. The new building will have classrooms, laboratories, bookstore, student lounge and business offices. The HVAC system uses chilled water air handling units and variable air volume boxes for temperature and zone control. Electric coils will provide heating and re-heating. The chilled water will be from the hospital’s main chilled water loop.
|
| Year: |
2006
|
|