I am writing to let you know what a fine job you team is doing while servicing our many a.c. systems here at Coca Cola Enterprises (Brandon Shared Services). I have got to know most of the technicians that do our maintenance and repairs and am very impressed with the work that has been done the last 18 months I have been associated with the facilities here in Brandon and MSI. I have always received a positive reception over the phone and all response times have been phenomenal. The A.C. unite have well taken care of when your techs are onsite and I have had no problems with them.
I consider MSI my most respected contractor/vendor used at our facilities.
Thank you for all of the excellent service.”
Sincerely,
Danny Williams
Facilities Assistant
~ Coca Cola Enterprises
|
Case Study - Sea World Wild Arctic
Entertainment Experience
| Name and Project Type: |
|
| Location of Project: |
7007 SeaWorld Drive
Orlando, Florida
|
| General Contractor: |
SeaWorld of Florida, Inc. |
|
Pete Reynolds
|
| Project Description: |
Installation of life support systems serving a 500,000 gallon display tank, 200,000 gallon holding and feeding tanks and HVAC systems for 100,000 sq. ft. pre-ride and ride area served by 250 tons HVAC systems. Life support systems included salt-water circulation, cooling water, heating water, water purification and filtration as well as automation and controls, waste management and O-zone treatment systems. |
|
Project Manager: |
Steve Patiry
|
| Year: |
1995
|
|