I just wanted to take a minute to let you and you company know that it was a pleasure working with MSI at the Kissimmee Christian Academy. Steve Benjamin was great in expediting materials along with answers to the issues that we encountered during this job. Robert Jones, who ran the onsite operations, did an outstanding job as a safe and very professional employee of your company. Robert represented MSI in a very top notch manner from the start all the way to the end. I’m glad we’ll be working with him again on the Burlington Coat Factory job as well as the other members of that team. Thanks for all your help.”

Sincerely,

Darrell Clark
Project Manager

~ Johnson-Laux Construction


Case Study - Sea World Discovery Cove

Entertainment Experience

Name and Project Type:   
Sea World Discovery Cove
 
Location of Project:
6000 Discovery Cove Way
Orlando, FL
 
General Contractor:
SeaWorld of Florida, Inc.
John M. Linn
 
Project Description:
Discovery Cove – Paradise comes to Orlando. An all inclusive property- interactive park. Project scope includes a 2.5 million gallon dolphin salt water tank, 2.0 million gallon shark fresh water tank, 1.0 million gallon Florida river fresh water tank, 1600 ton Central Energy Plant, 500 hp hot water boiler plant, 7 miles of process and HVAC piping and multiple pumping systems.
 
Project Manager:
Steve Patiry
 
Year:
2000
 